Shenandoah Middle School Addition

Shenandoah Middle School Addition

Shenandoah Middle School Addition MCHarry was hired to create an addition to the school. They added anew 154 student station, 8,276.5 sf single story classroom building with a 2,410 sf attached PE shelter. The new building has 7 middle school classrooms, 2 group...
Benjamin Franklin K-8 Center

Benjamin Franklin K-8 Center

Benjamin Franklin K-8 PROJECT DETAILS LOCATION                                                                                                                                                                      Miami, Florida CLIENT                                   ...
Arcola Lake Elementary

Arcola Lake Elementary

Arcola Lake Elementary Arcola Lake Elementary school is a New Construction project. Scope entails new construction of a 97 student station, 12,000sf ESE Building along with covered walk connector to the existing buildings on campus. The ESE building consists of 9 Part...
West Lakes Preparatory Academy

West Lakes Preparatory Academy

West Lakes Preparatory Academy West Lakes Preparatory Academy is a new  K-8 Center located within an existing MDCPS school campus.  The original school was designed in the 1980s for at risk students housing 430 student, which was closed in 2000.  MCHarry was asked to...
Southwest Miami Senior High School

Southwest Miami Senior High School

Southwest Miami Senior High School Southwest Senior High School was originally built in 1956. It’s original floor to ceiling windows are being updated throughout the school to reflect the liveliness and spirit they are known for. They will boast subtle hints of...